From January 8 to 10, the review meeting on preliminary design principles of Zhenxiong Low Calorific Value Coal Comprehensive Utilization Project was held in Zhenxiong County, Zhaotong City, Yunnan Province. The installed capacity of the project is 2×350MW, and a supercritical CFB (circulating fluidized bed boiler) coal-fired generator unit is adopted.